What Did The Project Involve?
This project involved multiple stages to ensure everything was completed to the highest standard. Careful planning was essential to align our installation with the overall construction timeline.
The small high-level windows needed to be fitted before tiling, so we installed them at the right stage. As with many large projects, adjustments were required along the way. A minor construction issue meant we had to return, temporarily removing a frame while the floor height was slightly altered to ensure a perfect fit.

To protect the sliding doors and glass, we retained a large section at our warehouse for a couple of months. This prevented potential damage while building materials were transported and gave the builders a wider entrance to work through.
Once the building was tiled and rendered, we returned for the final stage. Our team carefully cleaned the frames and glass, removing all protective coverings to reveal the finished installation in perfect condition.
Despite the complexities, our expertise and flexibility ensured a seamless result. The finished space blended luxury and functionality, with stunning uninterrupted countryside views, just as our customer envisioned.